
13 Electric Catwalks Across Three Field Divisions: A 2025 Delivery Case
How 13 electric power catwalks were configured and delivered to three Bohai Drilling field divisions in 2025: floor-height tiers, transport, commissioning.

How 13 electric power catwalks were configured and delivered to three Bohai Drilling field divisions in 2025: floor-height tiers, transport, commissioning.

At a Glance Field Detail Event 19th China (Dongying) International Petroleum & Petrochemical Equipment and Technology Exhibition (COYPE) Companion forum 2026 Oil-Local-University Conference on High-Quality

Explosion-proof tank cleaning robot field report: Ex db ib IIB T4 Gb certification, 60 cm manway entry and 200 m remote control keep crews outside.

At a Glance Metric Value Wells deployed 800+ units, 260+ wells documented Workover/cleaning interval From every 7-10 days to 30+ days (Yumen Y4-6) Units installed

At a Glance Item Detail Buyer Habrams Energy Services, Lagos — Nigerian oil & gas service/EPC contractor End-user project Seplat storage tank maintenance bid (Tank

Jingtao Energy’s electromagnetic wax prevention system has been deployed on over 800 oil wells across China’s major onshore basins — from Shengli on the east

8,882m Ultra-Deep Pipe Handling: 50,000+ Joints, Zero Incidents At a Glance When CNPC Western Drilling (西部钻探) spudded what would become Asia’s deepest onshore well at

Power Catwalk Deployment: PetroChina Xinjiang, Dagang & Peru Project Case Study Three new customer wins for Jingtao Energy’s Power Catwalk — an automated pipe handling

CNPC Team 90008 deployed Jingtao Energy power catwalk at 8,882 m — Asia deepest well. 50,000+ pipe joints handled, zero safety incidents, 99.2% availability, $412,400 saved per well.
We'll reply with a quote within 24 hours.
See our production line live via video. No travel required.