
Electromagnetic Wax Prevention for Oil Wells: Field Data on Workover Frequency
At a Glance Metric Value Wells deployed 800+ units, 260+ wells documented Workover/cleaning interval From every 7-10 days to 30+ days (Yumen Y4-6) Units installed

At a Glance Metric Value Wells deployed 800+ units, 260+ wells documented Workover/cleaning interval From every 7-10 days to 30+ days (Yumen Y4-6) Units installed

At a Glance Item Detail Buyer Habrams Energy Services, Lagos — Nigerian oil & gas service/EPC contractor End-user project Seplat storage tank maintenance bid (Tank

Jingtao Energy’s electromagnetic wax prevention system has been deployed on over 800 oil wells across China’s major onshore basins — from Shengli on the east

8,882m Ultra-Deep Pipe Handling: 50,000+ Joints, Zero Incidents At a Glance When CNPC Western Drilling (西部钻探) spudded what would become Asia’s deepest onshore well at

Power Catwalk Deployment: PetroChina Xinjiang, Dagang & Peru Project Case Study Three new customer wins for Jingtao Energy’s Power Catwalk — an automated pipe handling

CNPC Team 90008 deployed Jingtao Energy power catwalk at 8,882 m — Asia deepest well. 50,000+ pipe joints handled, zero safety incidents, 99.2% availability, $412,400 saved per well.

8 storage tanks, 3,200 m², 12 days. Jingtao Energy JT-2 robots achieved SA 2.5 with zero confined space entries at Shell Pulau Bukom. 85% cost reduction vs. scaffolding, coating adhesion 18.3 MPa.

Water cut reduced from 78% to 32%, oil production increased 41%. Jingtao Energy’s autonomous AICD screen technology transformed a Bohai Bay horizontal heavy oil well — zero electronics, zero chemicals, pure mechanical inflow control.

Project Date: May 15, 2026Location: Dongying, China (Dispatch) → Middle EastIndustry: Oil & Gas / E&PKey Technology: Associated Gas Cogeneration, CHP, Low-Pressure Gas Utilization 1. Executive Summary On May 15,
We'll reply with a quote within 24 hours.
See our production line live via video. No travel required.