Electromagnetic Wax Prevention System for Oil Wells

Electromagnetic Wax Prevention System for Oil Wells

Electromagnetic Wax Prevention System — 800+ Wells Deployed, Near-Zero Operating Cost

Chemical-free wax control for oil wells. No inhibitors. No hot oiling. No downtime.

🎬 Electromagnetic Wax Removal — 800+ Wells, Near-Zero Operating Cost

Electromagnetic wax prevention device — 650W, 60-80mT field strength, 800+ wells deployed globally

How It Works

A 650W electromagnetic field generator mounted at the wellhead applies a controlled alternating magnetic field (60-80mT) to the produced fluid. The field inhibits wax crystal nucleation and agglomeration — wax stays suspended and flows out with the oil instead of depositing on the tubing wall.

No chemicals. No hot oil trucks. No workover rigs. Just physics.

Why Operators Choose It

Approach Annual Operating Cost Downtime Environmental Impact
Chemical Injection High — continuous chemical consumption Minimal Chemical discharge into formation
Hot Oiling Moderate-High — recurring service cost 2–3 days per job Formation damage risk
Mechanical Scraping Moderate — frequent workovers Frequent workovers Neutral
Electromagnetic (Jingtao) Zero operating cost Zero Zero emissions, zero discharge

Field-Proven: 800+ Wells, 10-Year Track Record

Over 800 electromagnetic wax prevention units deployed across China, Oman, Russia, and Nigeria. The oldest installations — from 2014 — are still running after 10 years with minimal maintenance. The device has no consumable parts. No chemicals to replenish. No moving components to wear out.

One documented case in Tarim Basin: payback achieved in under one year with near-zero operating cost. Results vary by well conditions.

Technical Specifications

Parameter Specification
Power 650W
Magnetic Field Strength 60-80 mT
Max Well Depth ≥1,500 m
Controller MCU (upgraded from PLC)
Operating Temperature -30°C to 50°C
Certifications EX (explosion-proof), ATEX, ISO 9001, ISO 45001
Lifespan 10+ years (oldest units from 2014 still operational)
Maintenance Virtually zero — no consumable parts, no moving components

Installation

Mounted at the wellhead, connected to the produced fluid line. The electromagnetic field acts on the fluid as it passes through the device. Installation takes less than one day. No well intervention required.

Important: The device is heat-sensitive. Do not insulate. It is cold-tolerant — tested in Qinghai winters at -30°C.

Global Deployments

Country Status
China 800+ units — Tarim, Qinghai, Changqing, Shengli oilfields
Oman PDO — operational
Russia Gazprom — trial preparation
Nigeria Units exported and deployed

Response within 24 hours · Technical datasheets included · Virtual factory tour available